Chapter 32 works through four ways of drawing power from the nucleus, using the laboratory reports rather than the legends. It begins with the Molten-Salt Reactor Experiment at Oak Ridge, which went critical in 1965, ran on uranium-233 from 1968 with Glenn Seaborg at the controls, and was shut down in December 1969. It follows the money through the Joint Committee on Atomic Energy, the ORNL-4812 status report, the termination of 1973, the restart of 1974 and the final stop of 1976, and sets the documented budget reasons beside the claim that the plutonium fast breeder was favored for weapons. It then reads NUREG/CR-7176 on whether the thorium cycle can yield bomb material, along with ORNL's denatured-fuel design and the Shippingport light-water breeder. Small modular reactors and NASA's KRUSTY space reactor follow. The fusion section separates target gain from plant gain at the National Ignition Facility, then covers the SPARC tokamak, the Wendelstein 7-X stellarator, magnetized target fusion and Z-pinches, and Helion's published papers set against its company timeline. The chapter ends with decay power: radioisotope thermoelectric generators on Voyager, Curiosity and Perseverance, and nickel-63 betavoltaic cells.

Claims the chapter rates

Each claim gets one rating on the book's scale. How the ratings work.

ClaimRatingKind
The Molten-Salt Reactor Experiment ran successfully as a reactorProvenempirical
A thorium fuel cycle produces uranium-233, which regulators class with plutonium and HEU as Category I (popular claim: thorium can't make bomb material)Provenempirical
The AEC dropped the molten-salt breeder because the plutonium breeder served weaponsUntestedinterpretive
NIF achieved fusion target gain greater than 1Provenempirical
Helion's first fusion plant will be online by 2028, targeting 50 MW or more (company statement)Untestedempirical
A nickel-63 betavoltaic battery can run a phone for decades without rechargingUntestedempirical

Key numbers

MSRE thermal power
7.3 MW (no electricity generated) (ORNL-4676 (1971))
NIF shot of 5 Dec 2022
2.05 MJ laser in, 3.1 MJ fusion out (gain 1.5) (Abu-Shawareb et al. (2024))
Development spending compared
LMFBR about USD 1.8 billion (FY1948-74); molten salt USD 64 million (1957-72) (GAO RED-75-352 (1975); ORNL)
MMRTG output
about 110 W electric at launch from about 2,000 W of heat (NASA MMRTG fact sheet)
Nickel-63 half-life
101.2 years (US DOE Isotope Program)

Questions this chapter answers

Did the Oak Ridge molten salt reactor work?

The Molten-Salt Reactor Experiment at Oak Ridge worked as a reactor: it reached criticality on 1 June 1965, ran at 7.3 MW of heat with salt near 650 C and close to atmospheric pressure, and later became the first reactor fueled on uranium-233. It made no electricity. The book rates the claim that it ran successfully as a reactor Proven.

Can a thorium reactor make bomb material?

A thorium reactor can make bomb material in the sense regulators use. Thorium breeds uranium-233, which both the IAEA and the NRC place in Category I, the same tier as plutonium and highly enriched uranium. Uranium-232, which comes with it, emits hard gamma rays that make handling harder. The book rates the regulatory classification Proven.

Why did the US stop the molten salt reactor program?

The documents give budget reasons for ending the molten salt program: ORNL was told in January 1973 to wind the work down, it was revived in January 1974 and stopped again in February 1976. At the time the AEC's priority was the fast breeder cooled by sodium. The book rates the claim that weapons motives drove the choice Untested: no source read states it.

Did NIF produce more fusion energy than it used?

NIF produced more fusion energy than its laser delivered to the target, but not more than the facility drew. On 5 December 2022 NIF put 2.05 MJ of laser energy in and got 3.1 MJ out; in April 2025, 8.6 MJ from 2.08 MJ. The lasers drew roughly 300 to 400 MJ from the grid. The book rates target gain above 1 Proven.

How long can a nuclear battery last?

Nuclear batteries last decades in low-power devices: NASA's Multi-Mission RTG delivered roughly 110 W at launch, with a 17-year design life, three years of it in fueled storage before launch; each 1977 Voyager carried three plutonium-238 generators, about 470 W in all at launch. Nickel-63 has a 101.2-year half-life, but its cells give microwatts. The book rates the claim that one could run a phone for decades without recharging Untested.

Selected sources